Emergency Response Team

Emergency Response Team If accidents or force majeure happens, EJIP acts through our Emergency Response Team (TDL; Tim Darurat Lingkungan). Committed to mitigate damages, our TDL follows a thorough procedure and is well prepared with contamination control equipment.

Other Infrastructure

Industrial Water Supply Plant

EJIP has developed the Industrial Water Treatment Plant, which able to supply 18,000 ton/day in 24 hours

Electricity

Electricity supply to EJIP is mainly done by PT. Cikarang Listrindo and partially done by PT. Perusahaan Listrik Negara (Persero).

Natural Gas and Indutrial Gas

Natural Gas is supplied by PT. Perusahaan Gas Negara (Persero) through the pipeline and Industrial Gases are supplied by Air Liquid through the pipeline also.

E- Lab (EJIP LABORATORY)

The Testing Laboratory of EJIP is the accredited testing laboratory with the ISO/IEC 17025:2005

Waste Water Treatment

EJIP's Central Waste Water Treatment Plant (WWTP)

Telecommunication

EJIP is equipped with telephone lines, microwave radio link and optical fiber network.

Fire Protection

EJIP has installed pillar hydrant

Road

Internal Road

Public Electric Vehicle Charging Station (SPKLU)

Public Electric Vehicle Charging Station (SPKLU)