FACILITIES
Waste Water Treatment
EJIP's Central Waste Water Treatment Plant (“WWTP”) is
designed to treat the BOD (Biochemical Oxygen Demand), SS (Suspended Solid),
and COD (Chemical Oxygen Demand) content of the waste water.
With the total capacity 14,400 ton/day, WWTP
certainly can meet the customers need to dispose its product_on waste water
through WWTP and directly support the stability of the ecosystem and
environment.
Other Infrastructure
Industrial Water Supply Plant
EJIP has developed the Industrial Water Treatment Plant, which able to supply 18,000 ton/day in 24 hours
Electricity
Electricity supply to EJIP is mainly done by PT. Cikarang Listrindo and partially done by PT. Perusahaan Listrik Negara (Persero).
Natural Gas and Indutrial Gas
Natural Gas is supplied by PT. Perusahaan Gas Negara (Persero) through the pipeline and Industrial Gases are supplied by Air Liquid through the pipeline also.
E- Lab (EJIP LABORATORY)
The Testing Laboratory of EJIP is the accredited testing laboratory with the ISO/IEC 17025 : 2005
Telecommunication
EJIP is equipped with telephone lines, microwave radio link and optical fiber network.
Emergency Response Team
to preserve the conservation of environmental function and public safety
Fire Protection
EJIP has installed pillar hydrant
Road
Internal Road