FACILITIES

Waste Water Treatment

Waste Water Treatment

EJIP's Central Waste Water Treatment Plant (“WWTP”) is designed to treat the BOD (Biochemical Oxygen Demand), SS (Suspended Solid), and COD (Chemical Oxygen Demand) content of the waste water.

With the total capacity 14,400 ton/day, WWTP certainly can meet the customers need to dispose its product_on waste water through WWTP and directly support the stability of the ecosystem and environment.

Other Infrastructure

Industrial Water Supply Plant

EJIP has developed the Industrial Water Treatment Plant, which able to supply 18,000 ton/day in 24 hours

Electricity

Electricity supply to EJIP is mainly done by PT. Cikarang Listrindo and partially done by PT. Perusahaan Listrik Negara (Persero).

Natural Gas and Indutrial Gas

Natural Gas is supplied by PT. Perusahaan Gas Negara (Persero) through the pipeline and Industrial Gases are supplied by Air Liquid through the pipeline also.

E- Lab (EJIP LABORATORY)

The Testing Laboratory of EJIP is the accredited testing laboratory with the ISO/IEC 17025 : 2005

Telecommunication

EJIP is equipped with telephone lines, microwave radio link and optical fiber network.

Emergency Response Team

to preserve the conservation of environmental function and public safety

Fire Protection

EJIP has installed pillar hydrant

Road

Internal Road