FACILITIES


INFRASTRUCTURE

Public Electric Vehicle Charging Station (SPKLU)

Public Electric Vehicle Charging Station (SPKLU)

Road

Internal Road

Fire Protection

EJIP has installed pillar hydrant

Emergency Response Team

to preserve the conservation of environmental function and public safety

Telecommunication

EJIP is equipped with telephone lines, microwave radio link and optical fiber network.

Waste Water Treatment

EJIP's Central Waste Water Treatment Plant (WWTP)

E- Lab (EJIP LABORATORY)

The Testing Laboratory of EJIP is the accredited testing laboratory with the ISO/IEC 17025:2005

Natural Gas and Indutrial Gas

Natural Gas is supplied by PT. Perusahaan Gas Negara (Persero) through the pipeline and Industrial Gases are supplied by Air Liquid through the pipeline also.

Electricity

Electricity supply to EJIP is mainly done by PT. Cikarang Listrindo and partially done by PT. Perusahaan Listrik Negara (Persero).

Industrial Water Supply Plant

EJIP has developed the Industrial Water Treatment Plant, which able to supply 18,000 ton/day in 24 hours

 


SECURITY AND FIRE FIGHTING

Fire Fighting

EJIP Fire Brigade is in duty for 24 hours for fire prevention and fire fighting activities

Security

EJIP own security officers protect security in EJIP for 24 hours.

 


PUBLIC FACILITIES

POSPOL EJIP

POSPOL EJIP

Mosque EJIP

EJIP mosque accommodates 2.100 people