ニュース

Cikarang Bridge I and II Traffic Flow Trial

Cikarang Bridge I and II Traffic Flow Trial 02 July 2024

The Bekasi Regency Government will begin testing the vehicle traffic flow of Cikarang Bridge I and II which connects the EJIP Industrial area with the MM2100 South Cikarang Industrial Area on Wednesday, July 3rd, 2024.

A review of the location was carried out by the Acting Regent of Bekasi together with Plh. Regional Secretary, and Head of the SDABMBK Service on Monday (01/07). The bridge opening and closing system is planned to be open from 05.00 to 18.00 WIB on Wednesday and will stop being implemented on Saturday and Sunday for evaluation.

Evaluations are carried out to monitor the progress of bridges that still have cracks. The trial of the opening and closing system and bridge will be monitored by the Bekasi Regency SDABMBK Service Team and the Bekasi Regency Transportation Service.



その他のニュース

11 June 2024
Grand Harvest of Shallot Commodities on Urban Farming Land

Grand Harvest of Shallot Commodities on Urban Farming Land

06 June 2024
Environmental Action: Tree Planting in EJIP

Environmental Action: Tree Planting in EJIP

16 May 2024
Dengue Fever Alert

Learn the Prevention and Symptoms of Dengue Fever

01 May 2024
Inauguration of Cikarang Bridges I and II

Inauguration of Cikarang Bridges I and II connecting EJIP-MM2100 Industrial Park